REALHUB is on fire today

Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular Features

Community Features

Association

Property Features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

Enjoy gulf views from this magnificent coastal Rosemary Beach estate home. Situated on boardwalk H, this wonderful location is just steps from both the beach and the cafes of Rosemary Beach. 
Built to a high standard, this custom all masonry block home with cooper roofing abounds with architectural detail ranging from pecky cypress ceiling inlays to brick and coastal wood flooring.
This larger Rosemary lot offers a dramatic pool with fountain backdrop and outdoor fireplace. There is ample parking for up to four vehicles.
A magnificent staircase leads you through this comfortable easy living floor plan. The main house features three floors with a finished basement. It connects to the carriage house via a 2nd floor bridge walkway. This property has several unique features not
available in many Rosemary Beach homes including a finished basement with a wine cellar, office and
game room, a fourth floor roof terrace with Gulf views, pecky cypress millwork, custom stained wide
heart pine flooring, 12 foot ceilings, solid 10 foot patio doors/windows, outside/inside fireplaces, four
off-street parking spaces and heated pool/hot tub. Only the finest materials were used to construct this
concrete home including a copper roof, oversized moldings, hidden half bath and liquor cabinet, Ipe
balconies, marble in bathrooms, Bevolo exterior lighting, Water Works fixtures, custom cabinetry and
incredible craftsmanship throughout. The property has a chef's kitchen and large hidden pantry with
high quality appliances including Sub-zero refrigerators, two ice makers, two wine refrigerators, two
ovens with six gas burners, warming drawer, DCS grill and filtered water system. The interiors capture
coastal elegance and provide its occupants a feeling of warmth and comfort. The stately architectural
style of the property's exterior is designed to allow cool, Gulf breezes to seamlessly flow inside the
property, which is perfect for the many beautiful Spring and Fall days of the Florida Panhandle. The
property has been used solely as a second home and has never been rented.
#850120

Inlet Beach

20 N Spanish Town Lane

5 Beds

5 Baths

4,568 Sq.Ft.

$5,295,000

MLS#: 850120

New home being constructed on the Beachside of Alys Beach presents 4 bedrooms, 4 baths and 2 half baths, a first floor gracious living, dining, kitchen area that opens to a covered loggia and courtyard with pool. A guest master bedroom and bath are conveniently situated on the first floor. A two-car garage provides valued parking and much needed storage space. The second floor offers a master bedroom and large master bath with tub and separate shower. The bedroom opens to a Court Terrace overlooking the courtyard below and features a summer kitchen. There are two additional guest bedrooms and baths with a bunk room off the media room. The third floor delivers a 912 square-foot rooftop terrace that delivers east and west views down Scenic Highway 30A and the rooftops of Alys Beach. The home consists of 4,185 square feet of conditioned space.
#810579

Alys Beach

17 S Charles Street

4 Beds

4 Baths

4,185 Sq.Ft.

$5,295,000

MLS#: 810579

Entered for comp purposes. 89 Featherbed Alley offers one of the largest courtyards in Alys Beach. Designed by Domin Bock Architects, this tower designated home overlooks Central Park, Caliza Pool, the Alys Beach Nature Preserve and has views of the Gulf of Mexico. An open kitchen, dining, living concept opens to the courtyard. Four generously sized bedrooms make up the second floor. The large third floor living room is outfitted with bunk niches and provides access to the 4th floor terrace. The house is outfitted with an elevator and has a two car garage with ample storage.
#854779

Alys Beach

89 Featherbed Alley

4 Beds

5 Baths

4,780 Sq.Ft.

$5,295,000

MLS#: 854779

TMc Architecture created the quintessential Antiguan influenced home that Alys Beach personifies, pairing the indoor living with the outdoor.  Connectivity begins with the 1st level kitchen, dining, & living rooms that open to the private courtyard hosting an enclosed loggia featuring beverage center, grill, & fireplace.  Operable glass doors function to enclose for those chilly evenings.
The primary elevation fronts the award-winning Sea Garden Walk pedestrian path creating a special environment for guests to enter the home and easy pedestrian travel to the private owners Beach Club, Caliza Pool, and Zuma Wellness Center.  North to Lake Marilyn & the nature preserve or south to the beach by way of Sea Garden Walk.  
Entering the home draws attention to the ebonized machined steel, floating staircase softened by reclaimed Oak stair treads derived from the same origin as the Oak ceiling beams and flooring.  11' ceiling height paired with full height windows nicely transfers the east to west sunlight throughout the dining, kitchen, & living areas reflecting upon the Venetian Plaster for peaceful ambiance.
The kitchen is appointed with professional appliances centered with a large marble island looking upon the dining & living area.  For work interruptions, an office located privately off the kitchen is available for such.  Outdoor entertaining is achievable having the outdoor covered loggia adjacent from the kitchen leading to the courtyard open to the sky.  Guests will be enamored by the uses of the private outdoor gathering spaces.
55 Hog Penny Alley boasts 4 bedrooms plus a double bunk room to accommodate family & friends. The primary bedroom suite is exclusive capturing privacy that opens to a personal roof terrace for those moon lit nights. In addition to, the primary has a private stair hall with direction to the home's glass, enclosed studio providing refuge as a media room, secondary living room or for a Zen yoga studio.  
The 3 guest suites & double bunk rooms are opposite to the primary bedroom for timely separation and privacy. Tastefully appointed bathrooms to suit.  
Additionally, this property provides a two car garages plus walk-in owners closet with 2nd refrigerator and additional storage closets for beach accompaniments and the like.  Furnishings convey with the sale.  This home is a must see and ready for immediate occupancy.
#971048

Inlet Beach

55 Hogpenny Alley

4 Beds

3 Baths

3,125 Sq.Ft.

$5,295,000

MLS#: 971048

There is something timeless about waking to the sight of the Gulf stretching endlessly beyond your window. At 5931 Gulf Drive, that experience becomes part of everyday life. Positioned directly on the shoreline within Hadley's Beach, an intimate community where only ten residences enjoy true Gulf-front placement, this fully furnished home invites you to live at the water's edge, where the rhythm of the waves sets the pace of the day.

Spanning 5,031 square feet, the residence was designed around the view. From the moment you enter, the Gulf commands attention--an ever-changing backdrop of turquoise water, white sand, and expansive coastal sky. Sunlight moves effortlessly through the home's generous living spaces, creating an atmosphere that feels both elevated and welcoming.

The heart of the home is where people naturally gather. A beautifully appointed kitchen with premium appliances opens seamlessly into the living and dining areas, creating a setting equally suited for celebratory dinners, holiday gatherings, or quiet mornings with coffee overlooking the shoreline. Every space feels connected, designed to bring family and friends together while never losing sight of the water beyond. With seven bedrooms and eight-and-a-half bathrooms, the home offers room to spread out and settle in. Yet it is the third-floor primary suite that truly captures the imagination. Elevated above the coastline, it feels almost suspended between sea and sky. Here, sweeping Gulf views greet the morning, while evenings are framed by breathtaking sunsets reflected across the water.

Outside, life naturally gravitates toward the Gulf. A private pool offers a refreshing retreat between beach walks, while the shoreline itself is just steps away. Days begin with sunrise strolls along the sugar-white sand and end with conversations carried by the sound of the surf. Thoughtful additions such as two laundry rooms and an elevator servicing all levels bring comfort and convenience to everyday living.

Offered fully furnished and with short-term rentals permitted, the home is prepared to be enjoyed from the moment you arrive. Whether envisioned as a gathering place for generations, a coastal retreat, or an investment in one of Panama City Beach's most desirable beachfront communities, the experience remains the same: effortless, refined, and deeply connected to the beauty of the Gulf.

At 5931 Gulf Drive, the shoreline is not simply a view--it becomes part of the way you live.
#791891

Panama City

5931 Gulf Drive

7 Beds

8 Baths

5,031 Sq.Ft.

$5,295,000

MLS#: 791891

There is a certain magic to living where the Gulf is always in view. At 5931 Gulf Drive, every day begins with the horizon stretching beyond your windows and ends with sunsets that paint the sky in remarkable color. Situated within Hadley's Beach, an intimate beachfront community where only ten residences enjoy direct Gulf frontage, this fully furnished home offers a rare opportunity to experience life just steps from the sugar-white sand and emerald waters of Panama City Beach.

Encompassing 5,031 square feet, the residence was thoughtfully designed to celebrate its extraordinary setting. Expansive windows invite natural light into every level, while panoramic views of the Gulf become a constant backdrop to daily life. The home's open, flowing design creates an effortless connection between indoor and outdoor living, allowing the beauty of the coastline to take center stage.

The main living spaces were created with gathering in mind. A beautifully appointed kitchen featuring premium appliances anchors the home, opening seamlessly to spacious dining and living areas where conversations linger, celebrations unfold, and every meal is accompanied by the ever-changing beauty of the water beyond.
 Offering seven bedrooms and eight-and-a-half bathrooms, the home provides generous accommodations without sacrificing comfort or privacy. The third-floor primary suite serves as a peaceful sanctuary, elevated above the shoreline with sweeping Gulf views that transform ordinary mornings into unforgettable moments and evenings into front-row seats for spectacular sunsets.

Outside, the coastal lifestyle unfolds naturally. A private pool offers the perfect place to unwind after a day on the beach, while the Gulf is only steps away, inviting morning walks along the shoreline and afternoons spent in the turquoise waters. An elevator connects every level with ease, and two laundry rooms add thoughtful convenience to the home's spacious design.

With short-term rentals permitted, the residence offers exceptional flexibility while remaining an extraordinary place to gather, relax, and create lasting memories. Offered fully furnished, every detail has been thoughtfully prepared so the next chapter can begin from the moment you arrive.

At 5931 Gulf Drive, the Gulf is more than a spectacular backdrop--it becomes the centerpiece of everyday living, where timeless coastal beauty and effortless luxury come together in one unforgettable beachfront home.
#1006343

Panama City Beach

5931 Gulf Drive

7 Beds

8 Baths

5,031 Sq.Ft.

$5,295,000

MLS#: 1006343

This four bedroom plus bunk room Alys Beach home embodies the best of Alys Beach. Primely located fronting the highly desired street of Nonesuch Way conveniently places this house amongst Caliza Pool & Restaurant, Arboleda Park, Zuma Wellness Center and the Town Center of Alys Beach. The Gary Justiss design delivers two master suites, an open kitchen/living/dining, a wood burning fireplace, a generous courtyard with private pool and covered loggia, and two car garage. Professionally designed interior furnishings are by the Musso Design Group.
#946959

Inlet Beach

94 Nonesuch Way

4 Beds

4 Baths

2,932 Sq.Ft.

$5,290,000

MLS#: 946959

This four bedroom plus bunk room Alys Beach home embodies the best of Alys Beach. Primely located fronting the highly desired street of Nonesuch Way conveniently places this house amongst Caliza Pool & Restaurant, Arboleda Park, Zuma Wellness Center and the Town Center of Alys Beach. The Gary Justiss design delivers two master suites, an open kitchen/living/dining, a wood burning fireplace, a generous courtyard with private pool and covered loggia, and two car garage. Professionally designed interior furnishings are by the Musso Design Group.
#946959

Inlet Beach

94 Nonesuch Way

4 Beds

4 Baths

2,932 Sq.Ft.

$5,290,000

MLS#: 946959

Nestled in the charming neighborhood of Old Seagrove, this exceptional custom home is a true testament to craftsmanship and design. It spans an impressive four levels, featuring five spacious bedrooms, each thoughtfully equipped with its own ensuite bathroom. Evening gulf views from the top-floor tower complete a wonderful day. As you step into the foyer and enter the main level of this exquisite home, you are immediately immersed in the artistry of custom trim and millwork, meticulously crafted from rare black cypress found rarely in homes here on 30a. 

Throughout the residence, six-inch white oak plank flooring creates a timeless backdrop, seamlessly connecting all of the living spaces. The heart of the home is found in the kitchen, living and dining space and the transition from indoor to outdoor living is effortlessly achieved with floor-to-ceiling NanaWalls. The gourmet kitchen boasts top-of-the-line amenities and custom pecky cypress cabinetry accented with elegant glass inlays. For effortless entertaining, a well-appointed wet bar is positioned off the kitchen. Convenience is key on the first level, which also features a mudroom with direct access to a second courtyard, complete with a summer kitchen and a gas fireplace.

The primary suite features cathedral-style ceilings crafted entirely from cypress. The spa-like ensuite bathroom showcases Carrara marble floors and showers, a theme that is echoed throughout all of the home's bathrooms. The second level offers a private balcony and three additional bedrooms, each accompanied by its own ensuite bath, ensuring comfort and privacy for guests. A second wet bar, additional laundry space and a cozy sitting room enhance this floor's conveniences. The third floor presents the ultimate children's suite, beginning with bunk beds crafted from black cypress. A generously sized bunk room awaits with four additional queen-over-queen bunks. This floor also features its own elegant bathroom suite with double vanities and an oversized shower. 

The fourth-floor tower sits above the canopy of Old Seagrove, offering panoramic views of the Gulf of Mexico. This level is designed for enjoyment with a well-appointed wet bar, complete with a wine refrigerator, making it effortless to entertain family and friends while relishing in the splendor of Gulf Coast sunsets.
#932465

Santa Rosa Beach

107 E Grove Avenue

5 Beds

5 Baths

5,295 Sq.Ft.

$5,285,000

MLS#: 932465

Nestled in the charming neighborhood of Old Seagrove, this exceptional custom home is a true testament to craftsmanship and design. It spans an impressive four levels, featuring five spacious bedrooms, each thoughtfully equipped with its own ensuite bathroom. Evening gulf views from the top-floor tower complete a wonderful day. As you step into the foyer and enter the main level of this exquisite home, you are immediately immersed in the artistry of custom trim and millwork, meticulously crafted from rare black cypress found rarely in homes here on 30a. 

Throughout the residence, six-inch white oak plank flooring creates a timeless backdrop, seamlessly connecting all of the living spaces. The heart of the home is found in the kitchen, living and dining space and the transition from indoor to outdoor living is effortlessly achieved with floor-to-ceiling NanaWalls. The gourmet kitchen boasts top-of-the-line amenities and custom pecky cypress cabinetry accented with elegant glass inlays. For effortless entertaining, a well-appointed wet bar is positioned off the kitchen. Convenience is key on the first level, which also features a mudroom with direct access to a second courtyard, complete with a summer kitchen and a gas fireplace.

The primary suite features cathedral-style ceilings crafted entirely from cypress. The spa-like ensuite bathroom showcases Carrara marble floors and showers, a theme that is echoed throughout all of the home's bathrooms. The second level offers a private balcony and three additional bedrooms, each accompanied by its own ensuite bath, ensuring comfort and privacy for guests. A second wet bar, additional laundry space and a cozy sitting room enhance this floor's conveniences. The third floor presents the ultimate children's suite, beginning with bunk beds crafted from black cypress. A generously sized bunk room awaits with four additional queen-over-queen bunks. This floor also features its own elegant bathroom suite with double vanities and an oversized shower. 

The fourth-floor tower sits above the canopy of Old Seagrove, offering panoramic views of the Gulf of Mexico. This level is designed for enjoyment with a well-appointed wet bar, complete with a wine refrigerator, making it effortless to entertain family and friends while relishing in the splendor of Gulf Coast sunsets.
#932465

Santa Rosa Beach

107 E Grove Avenue

5 Beds

5 Baths

5,295 Sq.Ft.

$5,285,000

MLS#: 932465

Exemplary coastal design juxtaposed ample privacy characterize this extraordinary beach side retreat ideally located in the heart of Old Seagrove within excellent proximity to beach access and centered between the neighboring communities of Seaside & Watercolor. Situated on an oversized quarter-acre lot, this beautiful custom-built home is finely appointed with professional interiors & decor curated by Alex & Cynthia Rice of Old Seagrove Homes. This elegant compound is comprised of six bedrooms & six and a half bathrooms including an attached carriage house outfitted with a full kitchen, living room, king suite and ensuite bathroom.
#943563

Santa Rosa Beach

92 Seagrove Village Drive

6 Beds

6 Baths

5,687 Sq.Ft.

$5,275,000

MLS#: 943563

With rental projections at $476,000 annually, this gorgeous beachfront residence provides the ultimate escape only seven minutes from 30A. This wonderful home has been designed to feature sweeping gulf views on every level. Soaring high above the white sandy beaches, this seven bedroom property offers an unmatched experience with its beachfront heated private pool, hot tub, & spacious pool deck. As an added bonus, the property offers a large turf area facing the beach, perfect for events. All of your guests will take delight in the first floor entertainment living room which leads out to the pool. This extraordinary home can accommodate up to 26 guests with balconies, porches & living spaces on every level. This coastal escape has been constructed perfectly with the ultimate vacation in mind. The first level of the home offers two separate living areas along with a kitchenette & foosball table. The second level features the main living area where you are greeted by a cozy fireplace and gorgeous furniture. The kitchen offers bar seating for eight and the dining table also has seating for eight. Just outside the sliding glass doors, the outdoor dining table has seating for eight as well. On every level of this home, you can open the balcony doors to take in the breeze & spectacular views. At this property, you have the ultimate retreat for unforgettable beach and pool days. Perfectly located just seven minutes from Rosemary Beach, you are just minutes from all the famous shops & restaurants 30A has to offer. This beachfront getaway is offered fully-furnished and conveys with strong rental history as well as many future rental bookings in place. Inquire today to set up a private tour of this lovely beachfront property.
#951751

Panama City Beach

22213 Front Beach Road

7 Beds

7 Baths

4,110 Sq.Ft.

$5,275,000

MLS#: 951751

Welcome to your dream coastal oasis just steps from the shops and dining at Rosemary Beach and the friendly beach accesses in Inlet Beach. This magnificent 8-bedroom, 8-bathroom, and 2 half-bath residence spans an impressive 6,064 square feet of pure luxury living on a quarter of an acre. This home offers the perfect blend of tranquility and convenience.

One of the standout features of this property is its stunning 50-foot heated pool and spa, creating an immediate sense of relaxation and entertainment. As you drive up, the curb appeal is enhanced by a spacious 2-car garage, providing ample parking and convenience for you and your guests.

For those who love to entertain, the outdoor kitchen and bar complete with both a flat top and standard gas grill is a highlight.
#971930

Inlet Beach

311 Walton Rose Lane

8 Beds

8 Baths

6,064 Sq.Ft.

$5,275,000

MLS#: 971930

Exemplary coastal design juxtaposed ample privacy characterize this extraordinary beach side retreat ideally located in the heart of Old Seagrove within excellent proximity to beach access and centered between the neighboring communities of Seaside & Watercolor. Situated on an oversized quarter-acre lot, this beautiful custom-built home is finely appointed with professional interiors & decor curated by Alex & Cynthia Rice of Old Seagrove Homes. This elegant compound is comprised of six bedrooms & six and a half bathrooms including an attached carriage house outfitted with a full kitchen, living room, king suite and ensuite bathroom.
#943563

Santa Rosa Beach

92 Seagrove Village Drive

6 Beds

6 Baths

5,687 Sq.Ft.

$5,275,000

MLS#: 943563

With rental projections at $476,000 annually, this gorgeous beachfront residence provides the ultimate escape only seven minutes from 30A. This wonderful home has been designed to feature sweeping gulf views on every level. Soaring high above the white sandy beaches, this seven bedroom property offers an unmatched experience with its beachfront heated private pool, hot tub, & spacious pool deck. As an added bonus, the property offers a large turf area facing the beach, perfect for events. All of your guests will take delight in the first floor entertainment living room which leads out to the pool. This extraordinary home can accommodate up to 26 guests with balconies, porches & living spaces on every level. This coastal escape has been constructed perfectly with the ultimate vacation in mind. The first level of the home offers two separate living areas along with a kitchenette & foosball table. The second level features the main living area where you are greeted by a cozy fireplace and gorgeous furniture. The kitchen offers bar seating for eight and the dining table also has seating for eight. Just outside the sliding glass doors, the outdoor dining table has seating for eight as well. On every level of this home, you can open the balcony doors to take in the breeze & spectacular views. At this property, you have the ultimate retreat for unforgettable beach and pool days. Perfectly located just seven minutes from Rosemary Beach, you are just minutes from all the famous shops & restaurants 30A has to offer. This beachfront getaway is offered fully-furnished and conveys with strong rental history as well as many future rental bookings in place. Inquire today to set up a private tour of this lovely beachfront property.
#951751

Panama City Beach

22213 Front Beach Road

7 Beds

7 Baths

4,110 Sq.Ft.

$5,275,000

MLS#: 951751

1 ... 130 131 132 133 134 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by Kornelije Josić via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by Kornelije Josić via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.